Skip to content
Services and engineering framework

Every project moves through 10 structured steps in two phases: pre-agreement alignment and feasibility, then high-velocity product engineering and scale.

Every engagement

Fixed milestones, a transparent budget and a senior team that stays with your product after launch.

48h

Onboarding kickoff

A senior squad in your tools and shipping code within 48 hours.

14days

Sprint cadence

Staging demos, reviewable pull requests and full transparency every cycle.

100%

IP and code ownership

Source code, repositories and designs are yours from the first commit.

99.9%

Availability target

Automated CI/CD, staging environments and instant rollback on every release.

100% senior squad

Experienced builders who understand systems architecture. No junior outsourcing.

Direct Slack and GitHub

Talk to the engineers writing your code, not an account layer.

Clean architecture

Full type safety, modular design and no hidden technical debt.

Production SLAs

Unit tests, security audits and monitored, zero-downtime releases.

Engineering Workflow

A 10-step execution model split into technical discovery (Steps 01–05) and active sprint engineering (Steps 06–10).

  1. Phase 01 / Steps 01 to 05

    Pre-contract alignment

  2. Meeting 01Meeting

    Step 01: Technical Discovery Call

    Discuss your tech stack, system requirements, scale targets, and core project milestones directly with our engineers.

    DeliverableWithin 24 hours

    Technical scope and architecture brief

    A clear view of requirements, scale targets and tech stack options.

  3. Requirements Lock

    Step 02: Scoping & Feature Prioritization

    We map user workflows, define API requirements, and lock down core scope while pruning non-essential features.

    Deliverable1 to 2 working sessions

    Feature priority matrix and MVP scope lock

    A definitive MVP boundary, with non-essential complexity removed.

  4. System Audit

    Step 03: Infrastructure & Environment Audit

    Reviewing existing codebases, database query patterns, third-party integrations, and performance bottlenecks.

    DeliverableFull system review

    Codebase audit and vulnerability report

    Security bottlenecks, query inefficiencies and tech debt risks identified.

  5. 2-3 Alignment CallsMeeting

    Step 04: Feasibility, Cost & Capacity Sizing

    Conducting alignment sessions to evaluate architecture feasibility, infrastructure budget, compliance requirements, and squad sizing.

    DeliverableFixed milestones and sizing

    Capacity model and transparent budget plan

    Honest timeline commitments, an infrastructure cost model and squad allocation.

  6. Contract Signed

    Step 05: Milestone & Scope Finalization

    Finalizing sprint deliverables, repository access rules, timeline milestones, and signing transparent legal agreements.

    DeliverablePre-contract milestone

    Signed NDA, MSA and sprint schedule

    Legal protection, clear sprint deliverables and mutual sign-off.

  7. Phase 02 / Steps 06 to 10

    Contract signed. Sprint engineering begins.

  8. Architecture Lock

    Step 06: System Architecture & Schema Design

    Designing normalized database schemas, type-safe API contracts, and service boundaries before executing feature code.

    DeliverableArchitecture lock

    Normalized DB schemas and OpenAPI specification

    Type-safe API contracts and a foundation without tech debt.

  9. 2-Week Sprints

    Step 07: Agile Sprint Releases & PR Reviews

    Our senior squad ships production code in 2-week sprints with reviewable GitHub pull requests, unit tests, and staging demos.

    Deliverable2-week sprints

    Reviewable GitHub PRs and staging preview URLs

    Tested, reviewable production code shipped every 14 days with live demos.

  10. Automated Testing

    Step 08: QA, CI/CD & Security Audits

    Continuous integration pipelines run automated unit tests, integration checks, dependency audits, and load tests.

    DeliverableContinuous CI/CD

    Automated test suites and security audit passes

    Unit, integration and security gates pass before every deployment.

  11. 99.9% Availability

    Step 09: Zero-Downtime Launch

    Automated deployment pipelines release software on AWS, Docker, or Vercel with real-time telemetry and instant rollback support.

    DeliverableZero-downtime deploy

    Production release with instant rollback

    A seamless release on AWS, Docker or Vercel with telemetry active.

  12. Long-Term Growth

    Step 10: Performance Optimization & Scaling

    We track telemetry logs, DB query efficiency, and system metrics post-launch to keep performance snappy as user traffic grows.

    DeliverableOngoing production SLA

    Real-time telemetry and APM dashboard

    Proactive query monitoring, fast response times and scale tuning.

Start a project

Tell us about your roadmap. You'll hear back within 24 hours with a clear technical plan, and no sales pressure.

hello@devcity.us